Thursday, March 26, 2009

Repair man came at 7:00 p.m. last night. Something wrong with the control panel on the arch. He "jerry-rigged" it last night so Harvey could boil. Repair man coming back today to try and figure things out.

Harvey boiled from 7:30 to 9:30 p.m. and made 30 gallons of A-Dark.

It was 28 degrees this morning, but sap ran all night. Harvey has 2 full tanks and beginning to run in the 3rd tank.

No comments: